We now have all the drain pipes, hot and cold water pipes and the gas pipes installed in the bathroom and kitchen. The drain pipes are connected to to the septic system, the water and gas still need to be connected to the well and the gas meter. Those should be done today. The bath tub is also scheduled to be installed today. These new pictures look a lot like the last batch, but everything is in now and insulated. He has done a real good job and we now have confidence in our plumbing once we cover it all up. We knew it was a mess down there, just like we knew about the electric! The sump pump still needs to be installed in the crawl space, the plumber brought his own pump over yesterday and got most of the water out from under there. Things are moving right along now!